Past Accomplishments

  • Harmony Oakville

    Harmony Oakville

    A new community of 166 stacked townhouse units built in Oakville for Peppergate Developments. Zerem did all electrical work for the garage, in 2015 and 2016.

  • Velocity at the Square

    Velocity at the Square

    A 40-storey rental tower with 337 units at Toronto’s core, Dundas Square, which was finished in the spring of 2017. Our scope of work included lighting, heat tracing, lightning protection, and high voltage work. The construction manager was Tucker HiRise.

    ,
  • 66 Isabella

    66 Isabella

    A 23-storey luxury building in the Church-Wellesley Village for Park Properties, which houses 199 rental units and 12 condo suites. Completed in early 2016.

  • 190 Clark Blvd

    190 Clark Blvd

    A 22-storey rental apartment building in Brampton with 225 units, completed in early 2017, for the developer Preston Homes.

  • Flo Condos

    Flo Condos

    A 94-suite, 12-storey condominium building at Yonge & Sheppard that was completed in the summer of 2015.

  • O2 Maisonettes on George

    O2 Maisonettes on George

    A 50-suite, 14-storey condo and townhouse development in downtown Toronto that was completed in early 2016.

  • Tableau Condos

    Tableau Condos

    The story of Tableau unfolds below, on and above a table. Historical preservation meets modern design and style in the form of a podium, built to embrace a piece of Toronto’s heritage. This table, built on strong supporting legs, divides space, separates use, gracefully identifies public and private areas and yet as a unified form […]

    ,
  • The Loretto

    The Loretto

    A 50-suite, five-storey luxurious condo project built within an existing structure that was formerly a school in the Annex neighbourhood of Toronto. The construction was completed in 2007.

    ,
  • 9T6

    9T6

    An 18 storey, 220-suite high-rise condominium building in downtown Toronto, completed in 2008.

  • iLoft

    iLoft

    A 30 storey, 280-suite high rise condominium building with four underground parking levels, interconnected with the phase I tower (The Tides)