A new community of 166 stacked townhouse units built in Oakville for Peppergate Developments. Zerem did all electrical work for the garage, in 2015 and 2016.
A 40-storey rental tower with 337 units at Toronto’s core, Dundas Square, which was finished in the spring of 2017. Our scope of work included lighting, heat tracing, lightning protection, and high voltage work. The construction manager was Tucker HiRise.
A 23-storey luxury building in the Church-Wellesley Village for Park Properties, which houses 199 rental units and 12 condo suites. Completed in early 2016.
A 22-storey rental apartment building in Brampton with 225 units, completed in early 2017, for the developer Preston Homes.
A 94-suite, 12-storey condominium building at Yonge & Sheppard that was completed in the summer of 2015.
A 50-suite, 14-storey condo and townhouse development in downtown Toronto that was completed in early 2016.
The story of Tableau unfolds below, on and above a table. Historical preservation meets modern design and style in the form of a podium, built to embrace a piece of Toronto’s heritage. This table, built on strong supporting legs, divides space, separates use, gracefully identifies public and private areas and yet as a unified form […]
A 50-suite, five-storey luxurious condo project built within an existing structure that was formerly a school in the Annex neighbourhood of Toronto. The construction was completed in 2007.
An 18 storey, 220-suite high-rise condominium building in downtown Toronto, completed in 2008.
A 30 storey, 280-suite high rise condominium building with four underground parking levels, interconnected with the phase I tower (The Tides)