The primary terminus for the new Hazel McCallion Light Rapid Transit line being constructed in Mississauga along Hurontario Street.
The supply and installation of a new gas-powered generator for a Scarborough office of the Toronto Children’s Aid Society, done in early 2018.
The replacement of the fire alarm system at this school in North York, for the Toronto District School Board. The job took place in summer/fall 2018, with switchover completed in early 2019.
A four-storey commercial office building for Jame Financial Inc. Construction is set to run until early 2019.
The electrical work, lighting, and audio wiring for the first Canadian location of this popular American gym. It is located at the ground and second floor of the Picasso Condominium building on Richmond street. The work was for Javlee Construction and the gym opened on October 21st, 2017.
The fire alarm system upgrade of a large parking garage at 2 Church Street, the TPA Carpark #43. The work was completed in 2006.
The construction of a new retail plaza in Brantford. The work was done for Norstar Developments, built in 2007.
Construction of a new commercial plaza in Orangeville for Norstar Developments. The work was done in 2008.
The electrical design and construction of a seven-storey office building in downtown Toronto which now serves as the headquarters for Toronto’s Children’s Aid Society.
The electrical design and construction of two new buildings, with a total of 240 dwelling units, to house new army recruits at Canadian Forces Base Borden.