A three-building development with a total of 395 residential dwellings for the Benvenuto Group. Completion is expected in 2023.
A new 537-suite condo development steps from the Eglinton LRT Subway at 25 St Dennis Drive for DBS Developments. The project consists of an 11-storey mid-rise, a 37-storey high-rise tower, townhouses, and partial retrofit of an existing building. Zerem’s scope includes supply and installation of distribution system, fire alarm system, emergency generators, and installation of […]
A 427-unit condo development for ELAD Canada and Clark Construction Management. Zerem’s work includes supply and installation of high-voltage and low-voltage distribution, lighting fixtures, fire alarm system, lightning protection, natural gas generator, garage CO system, EV chargers, snow melting, and installation of water metering and electrical metering. The project construction timeline will run from 2023 […]
The supply, installation, and verification of a new fire alarm system, including conduit, wiring, and devices. Work is scheduled for the spring and summer of 2019.
A three-tower mixed-use development complex consisting of a total of 398 condominiums, five storeys of office space in one of the towers, and over 7500 square feet of retail space in the other two towers. The development is located at Queen and Dufferin, and is owned by Fitzrovia Real Estate. The Construction Manager is EllisDon. […]
Lighting upgrade at Bathurst Station for the TTC, including removal of existing light fixtures and supply and installation of new light fixtures. The general contractor was Duron Ontario Ltd and the work took place in early 2019.
Supply and installation of all conduit, wiring, and devices for a new fire alarm system, and then verification, in this 449-unit apartment building for Toronto Community Housing. The work is scheduled to continue through spring 2019.
The supply & installation of new lithium-battery 10-year smoke/CO alarms for over 4800 dwellings to replace existing smoke alarms for Toronto Community Housing tenants. The work took place in summer/fall 2018.
A complete fire alarm system replacement for two buildings, each with 290 apartments. The work included new fire alarm speakers in the apartments, strobes in the corridors, replacement of all fire alarm devices, and verification. The work was completed in early 2019.
A 106-suite 9-storey condominium by Malibu Investments. Construction took place in 2006.