Ongoing Projects

  • TRACTION POWER SUB-STATIONS

    TRACTION POWER SUB-STATIONS

    Supply, installation and commissioning of duct banks to carry grounding cables for traction power sub-stations for Mobilinx. Supply, installation and commissioning of the grounding grid for the traction power sub-stations, plus complete Ground Potential Study after installation. This spans the full 18km length of the future Hazel McCallion LRT line in Mississauga.

    ,
  • Operation, Maintenance and Storage Facility

    Operation, Maintenance and Storage Facility

    The supply and installation of cable trays, hangers, supports, conduits, and grounding cables for the new Operation Maintenance Storage Facility serving the future Hazel McCallion Light Rapid Transit Line in Mississauga, Ontario. For Hitachi Rail, 2023.

    ,
  • TCHC Fire Alarm System Replacement at 200 Wellesley

    TCHC Fire Alarm System Replacement at 200 Wellesley

    Supply and installation of a new fire alarm system for this 29-storey apartment building in downtown Toronto. This includes new conduits, wiring, devices, control equipment, programming, verification, building new fire-rated closets, and removal of the old fire alarm system. We started work on this project in spring 2022 and are targeting to finish at the […]

    ,
  • Metro Park

    Metro Park

    A new 537-suite condo development steps from the Eglinton LRT Subway at 25 St Dennis Drive for DBS Developments. The project consists of an 11-storey mid-rise, a 37-storey high-rise tower, townhouses, and partial retrofit of an existing building. Zerem’s scope includes supply and installation of distribution system, fire alarm system, emergency generators, and installation of […]

    ,
  • Galleria III

    Galleria III

    A new 424-suite highrise condo for Almadev with Clark Construction Management, on the site of the former Galleria Mall. Completion is expected in 2025.

    ,
  • Bayview at the Village

    Bayview at the Village

    A 238-suite condo development by Canderel Residential, with completion expected in 2025.

    ,
  • The Mason at Brightwater

    The Mason at Brightwater

    A 146-suite condo building as part of the master-planned Brightwater community in Port Credit, with EllisDon as construction manager.

    ,
  • ConnectT Condos in Milton

    ConnectT Condos in Milton

    The tallest two buildings in Milton, at 25 and 21 stories, with a total of 431 condominium suites, for Lindvest Properties. Construction is slated to run through 2024.

    ,
  • AnX Condos

    AnX Condos

    A mixed-use 13-storey office and condo development for Freed Developments, with 118 condo suites. Construction is expected to finish in 2025.

    ,
  • Monza Condos

    Monza Condos

    A ten-storey 76-suite mixed-use condominium development by the Benvenuto Group, with Reliance Construction.

    ,