The fire alarm system upgrade of a large parking garage at 2 Church Street, the TPA Carpark #43. The work was completed in 2006.
![](https://zerem.com/wp-content/uploads/2023/05/no_image.png)
The fire alarm system upgrade of a large parking garage at 2 Church Street, the TPA Carpark #43. The work was completed in 2006.