Energy cost-savings work, primarily consisting of upgrading the common-area lighting to LED, for three TCHC buildings located at 15 Tobermory, 75 Tandridge, and 57 Mabelle. The general contractor is Buttcon, and the work wrapped up in late 2018.
Separately, Zerem also did the electrical work for individual metering of 565 suites for TCHC at 3847 Lawrence Avenue East, 10 Boultbee, and 80 Blake Street. This work was also for Buttcon, and was completed in summer 2018.