A 379-unit residential development for the Alterra Group. Zerem’s work includes the supply and installation of high-voltage and low-voltage distribution, fire alarm system, CO monitoring system, and natural gas generator, as well as the installation of light fixtures, electrical metering, and provisions for EV car chargers. The project is set to run from 2022 through 2025.
