Zerem is proud to be contributing to the new Ontario Line through our electrical work on a new step-up substation building near the future Exhibition Station, located at the western terminus of the line.
Scheduled for late 2026, our scope includes the supply and installation of the building’s low voltage power system, grounding and bonding, lightning protection, lighting, fire alarm system, and digital metering system.
This work forms part of the critical infrastructure required to support the safe, reliable operation of Toronto’s newest rapid transit line, helping expand connectivity across the city and strengthen the region’s growing transit network.
