We are delivering temporary power infrastructure for three key sites connected to the future Ontario Line Maintenance and Storage Facility: 36 Overlea Blvd, 40 Beth Nealson Dr, and 50 Village Station Rd.
Our work, which is taking place from 2025 through 2027, includes the full design, installation, and ongoing maintenance of temporary power systems required to support construction activities throughout the Ontario Line project. The scope includes electrical distribution, civil equipment foundation pads, duct banks and conduit systems, high-voltage cabling, and maintenance services for the duration of the construction period.
By providing safe, reliable, and well-coordinated temporary power solutions, our team is helping support the successful delivery of one of Ontario’s major transit infrastructure projects.