28 Eastern

A 379-unit residential development for the Alterra Group. Zerem’s work includes the supply and installation of high-voltage and low-voltage distribution, fire alarm system, CO monitoring system, and natural gas generator, as well as the installation of light fixtures, electrical metering, and provisions for EV car chargers. The construction is ongoing, with occupancy expected in late 2024.