New Construction

New construction of residential buildings.

Southside Condos

Thursday, June 22, 2017 @ 10:06 AM
posted by: admin

142c5ca_b19a

This Toronto development by Malibu Investments consists of two condominium towers. You will find Southside Condos near Wilson Station in North York. The address is 9 Tippett Road, and there will be a total of 484 condo suites. The work commenced in the fall of 2017, with occupancy set for 2020. Below – photos of the completed energized electrical room.

Electrical room completed

Electrical room completed

off

390 Dufferin

Thursday, October 11, 2018 @ 08:10 PM
posted by: admin

5809-115233A three-tower mixed-use development complex consisting of a total of 398 condominiums, five storeys of office space in one of the towers, and over 7500 square feet of retail space in the other two towers. The development is located at Queen and Dufferin, and is owned by Fitzrovia Real Estate. The Construction Manager is EllisDon. Work commenced in the fall of 2018.

off

Cumberland Tower

Tuesday, September 13, 2016 @ 10:09 AM
posted by: admin

The 304-suite landmark Cumberland Tower stands at the corner of Avenue Road and Cumberland. Below is a brief description from the developer’s marketing materials.

cumberland

 

The Cumberland Tower, a signature condominium residence coming to Toronto’s prestigious Bloor-Yorkville neighbourhood by Camrost-Felcorp. Towering 40 storeys above the downtown Toronto skyline, The Cumberland Tower offers condo residents an unparalleled level of luxury and distinction in the city. The iconic Yorkville corner of Cumberland and Avenue Road will be elevated to legendary status with architecture, opulence and art reflecting design of the highest form.

off

Velocity at the Square

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

velocity

 

A 40-storey rental tower with 337 units at Toronto’s core, Dundas Square, which was finished in the spring of 2017. Our scope of work included lighting, heat tracing, lightning protection, and high voltage work. The construction manager was Tucker HiRise.

off

Tableau Condos

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

tableauThe story of Tableau unfolds below, on and above a table. Historical preservation meets modern design and style in the form of a podium, built to embrace a piece of Toronto’s heritage. This table, built on strong supporting legs, divides space, separates use, gracefully identifies public and private areas and yet as a unified form creates a structure that is distinctly and undeniably Tableau.
Tableau is a 36-storey mixed-use building designed by Wallman Architects featuring 410 residential suites, 25,000 sq.ft. of office space and retail space at the ground level.
Suites and amenities are beautifully designed by Cecconi Simone with outdoor space and landscape created by Claude Cormier Landscape Architects. The signature element of the building is a structural “table” on which the residential portion of the building sits, strategically locating it above the site’s existing warehouse building. The front of this building is being reinterpreted and reconstructed and will accommodate the commercial office space, ground floor lobby and retail. The table structure also creates a large, four-storey colonnaded public plaza on Richmond Street.

tableau-2

tableau-3

off

Joy Condos

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

joycondos

 

 

Joy Condos is a 283-suite development that comprises a 21-storey glass and metal panel tower and 22 three-storey townhouses for Gemterra Developments. This project was completed in spring 2018.

off

Smart House Condo

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

smarthouse-amenities_img05

 

 

A 256-suite, 25-storey “micro-condos” development built in the heart of downtown Toronto, constructed from 2016-18. The developers were Urban Capital Group and Malibu Investments.

off

Canvas Condos

Wednesday, January 17, 2018 @ 09:01 AM
posted by: admin

canvas

 

A 170-suite condominium on the Danforth for Marlin Spring Developments. Zerem’s work commenced in summer 2018. Our foreman is Frank DeFranco.

off

Distinction Condos

Monday, April 30, 2018 @ 10:04 AM
posted by: admin

distinction

 

A 160-suite condo for Lash Group in midtown Toronto. Construction started in autumn 2018. Zerem’s foreman is David Baker.

off

Upper Vista

Tuesday, June 20, 2017 @ 03:06 PM
posted by: admin

Upper-Vista-Condos-rendering1-v5

A ten-storey 150-suite luxury condominium development in Niagara Falls for Evertrust Developments. Occupancy got underway in the fall of 2019.

off

Monaco Condos

Thursday, October 17, 2019 @ 04:10 PM
posted by: admin

Monaco is a new development in Collingwood, consisting of 127 suites in a six-storey building, for YYZed Construction Management. Work begins in late 2019.

off

Barrington Condos

Wednesday, August 3, 2016 @ 07:08 PM
posted by: admin

18267-61270

 

 

A 93-suite condo development at Bathurst & St Clair, for Lash Developments. The project was completed in summer 2019.

off

West Beach Condos

Wednesday, January 17, 2018 @ 09:01 AM
posted by: admin

west beach

 

An 89-suite condominium for Marlin Spring Developments on Queen Street East. Zerem’s work on site commenced in early 2019.

off

Pace on Main

Wednesday, November 9, 2016 @ 12:11 PM
posted by: admin

pace on main

 

A 67-suite condo development in Stouffville, for Geranium Homes. Construction took place during 2017-18.

off

Picnic Condos

Wednesday, February 1, 2017 @ 12:02 PM
posted by: admin

PicnicImageReg1

 

A 61-suite eight-storey boutique condo building across from High Park, for North Drive Investments. Construction took place from fall 2017 until spring 2019.

off

35 Wabash

Friday, January 27, 2017 @ 01:01 PM
posted by: admin

35 wabash

 

A four-storey boutique community of 60 townhouses in Roncesvalles, for Zinc Developments. The project was completed in summer 2019.

off

The Perry Condo

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

theperry

 

 

A boutique 42-suite luxury condominium under construction near Yorkville for the developer Mansouri Living, with construction substantially completed in fall 2018. Ongoing work is under way for penthouse customizations.

off

2800 Bloor

Wednesday, November 22, 2017 @ 11:11 AM
posted by: admin

2800 bloor - 2

 

A 34-suite eight-storey luxury condominium building for North Drive Investments, in Etobicoke. Occupancy is set for autumn 2019.

off

346 Davenport

Friday, June 14, 2019 @ 03:06 PM
posted by: admin

A boutique nine-storey luxury condominium building with 30 units. Construction will take place in 2020 and 2021.

off

Block 32

Monday, February 13, 2012 @ 07:02 PM
posted by: admin

Development complex, 420 suites, consists of one 42-storey tower building, one 11-storey building and one nine-storey building. The three buildings have a common parking garage, a common courtyard and common electrical systems (high voltage, distribution, generator and fire alarm). The project was for Toronto Community Housing, and was completed in 2012.

off

Visto Condo

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

visto

 

A nine-storey, 128-suite condominium near highway 401 and Keele in Toronto, for the developer Mizen Holdings. Occupancy was in spring 2017.

off

Fire Alarm Upgrade for Toronto Community Housing at Weston Towers

Thursday, December 22, 2016 @ 11:12 AM
posted by: admin

3101 weston

The fire alarm system upgrade for this 18-storey apartment building in North York. This includes supply and installation of an addressable main fire alarm control panel, voice evacuation system and all associated equipment. The fire alarm system was swapped in late 2017.

 

off

4 Goldfinch Court

Thursday, January 5, 2017 @ 11:01 AM
posted by: admin

The conversion of a large penthouse suite into seven smaller apartments at a building in the Bathurst & Finch area. This was for Scarsdale Investments and Cherishome Living, and the work was completed in spring 2017.

off

77 Keewatin

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

77keewatin

 

An eight-storey 79-unit midtown rental building for Greenwin Property Management. Construction was completed in early 2017.

off

190 Clark Blvd

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

A 22-storey rental apartment building in Brampton with 225 units, completed in early 2017, for the developer Preston Homes.

1452288450_190_clark_exterior

1452288455_190_clark_hallway

off

66 Isabella

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

66 isabella

 

A 23-storey luxury building in the Church-Wellesley Village for Park Properties, which houses 199 rental units and 12 condo suites. Completed in early 2016.

off

O2 Maisonettes on George

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

o2 condos

 

A 50-suite, 14-storey condo and townhouse development in downtown Toronto that was completed in early 2016.

off

Flo Condos

Wednesday, August 3, 2016 @ 05:08 PM
posted by: admin

A 94-suite, 12-storey condominium building at Yonge & Sheppard that was completed in the summer of 2015.

flocondos

flo lobby

 

off

Nicholas Residences

Thursday, August 4, 2016 @ 02:08 PM
posted by: admin

A 224-suite, 35-storey condominium building in downtown Toronto, completed in 2014.

nicholasnicholas lobby

off

Terraces on Danforth

Wednesday, August 31, 2016 @ 09:08 AM
posted by: admin

terrace on the danforth

 

A 95-suite condominium by Liberty Development Corporation completed in late 2013.

off

The Rushton

Monday, February 13, 2012 @ 07:02 PM
posted by: admin

Located at 743 St. Clair Ave. W. at the corner of Rushton Rd, The Rushton is a mid-rise, 35-residence boutique building, that has been designed with urban flair in mind. Since The Rushton will be a limited edition residential development, the building has been designed to optimize an environment of friendly refinement.

off

Museum House

Monday, February 13, 2012 @ 07:02 PM
posted by: admin

A 19-storey 26-suite luxury condo building on Bloor Street, across from the Royal Ontario Museum. Completed in 2013.

off

LTD

Monday, February 13, 2012 @ 07:02 PM
posted by: admin

LTD is a 15-storey, 199-suite high rise condominium development completed in 2012 for Malibu Investments.

off

Joy Red Hot Condos

Monday, February 13, 2012 @ 07:02 PM
posted by: admin

Red Hot Condos is the hottest condominium around – offering an urban community, steps from the city yet surrounded by the magnificent Moccasin Trail Park in Don Mills’ most desirable neighbourhood.  A stunning fusion of brick and glass, featuring spicy RED hot modern designs to suit busy lifestyles and a fabulous amenities component to make any residents life sizzle with excitement.

off

The Russell Hill

Tuesday, December 20, 2016 @ 09:12 AM
posted by: admin

russellhill

A seven-storey, 24-suite luxury retirement residence in Toronto’s Forest Hill Neighbourhood. Completed in 2009.

off

iLoft

Tuesday, March 20, 2012 @ 08:03 PM
posted by: admin

iLoft

 

 

A 30 storey, 280-suite high rise condominium building with four underground parking levels, interconnected with the phase I tower (The Tides)

off

88 Spadina

Monday, December 5, 2016 @ 02:12 PM
posted by: admin

88 spadina

 

 

A 91-unit six-storey apartment building for Park Property Management Inc.

 

off

Fashion District Lofts

Monday, December 5, 2016 @ 01:12 PM
posted by: admin

 

455 adelaide

 

 

A 103-suite King West condominium for Freed Developments, completed in 2008.

off

9T6

Tuesday, March 20, 2012 @ 08:03 PM
posted by: admin

9T6

 

An 18 storey, 220-suite high-rise condominium building in downtown Toronto, completed in 2008.

off

777 Steeles West

Monday, December 5, 2016 @ 08:12 AM
posted by: admin

777 Steeles Avenue

A 72-suite condominium built for Lash Developments, completed in 2008.

off

St Andrew on the Green

Friday, May 18, 2018 @ 09:05 AM
posted by: admin

St-Andrew-On-The-Green-9-Burnhamthorpe-4 (1)

 

A 106-suite 9-storey condominium by Malibu Investments. Construction took place in 2006.

off

The Loretto

Tuesday, March 20, 2012 @ 08:03 PM
posted by: admin

OLYMPUS DIGITAL CAMERA

 

A 50-suite, five-storey luxurious condo project built within an existing structure that was formerly a school in the Annex neighbourhood of Toronto. The construction was completed in 2007.

off

20 Stewart

Monday, December 5, 2016 @ 01:12 PM
posted by: admin

20 stewart

 

A 59-suite boutique condo building for Freed Developments, completed in 2007.

off

St Andrew on the Green

Thursday, January 11, 2018 @ 12:01 PM
posted by: admin

standrew

A 106-suite condominium built in 2006 for Malibu Investments.

off

66 Portland

Monday, February 27, 2012 @ 09:02 PM
posted by: admin

66(1)

 

A nine-storey modern boutique loft building located in Toronto’s trendy King West neighbourhood. The building consists of 85 stylish lofts. The work was done for Freed Developments and Lash Development Corp.

 

off

The Tides

Monday, February 27, 2012 @ 09:02 PM
posted by: admin

The-Tides-At-Mystic-Pointe-185-Legion-Building

 

 

A luxurious 22-storey condominium on the shore of Lake Ontario, built for Camrost-Felcorp Developments.

 

off

Home on the Park

Wednesday, May 31, 2017 @ 10:05 AM
posted by: admin

383-Ellis-Park-Rd---Toronto-COndos

 

A 46-suite luxury condo building near High Park for Context Development. Completed in 2006.

off

Victoria Square

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

 

A ten-storey, 227-unit apartment building located in downtown Toronto’s Bathurst & King neighbourhood, for Boymelgreen Developers.

off

Savoy at Camelot

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

This building houses 157 high-end suites in Toronto’s Don Mills neighbourhood. The developer was Camrost-Felcorp.

off

L’Chaim

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

lchaim1(1)

 

A 30-room Jewish seniors’ residence located on Sheppard Ave. W., in Toronto’s Bathurst Manor community.

 

off

Solara

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

 

An 11-storey, 181-suite condo near Keele and Rogers in Toronto. The developer was The GenerX Corporation, and it was completed in 2004.

off

The Boot I and Boot II

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

 

A downtown Toronto condominium development of two buildings. The first building consists of 153 small suites, for Cresford Developments, built in 2003. The second building has 124 larger suites, and was completed in 2007.

 

Boot-Condos-2-76-Shuter-Street

off

Thornwood

Monday, February 27, 2012 @ 10:02 PM
posted by: admin

 

A condominium complex consisting of two buildings of 150 and 130 suites, by Cresford Developments, located off Yonge Street in Toronto’s Rosedale neighbourhood. Construction was completed in 2002 for phase I and in 2004 for phase II.

off

The Claremont

Monday, February 27, 2012 @ 09:02 PM
posted by: admin

 

 

The Claremont is an eight-storey retirement residence with 72 retirement homes, located in Toronto’s Rosedale community. The work was done for Central Park Lodges and the building was completed in 2002.

off

Terrace Heights

Monday, February 27, 2012 @ 09:02 PM
posted by: admin

906sheppard

 

Two low-rise condominiums in the Wilson Heights neighbourhood of North York, by Torbel developers. Each building has commercial units on the ground floor. The buildings were completed in 1999 and 2001, with a total of 128 suites.

off